Construction Updates

‚ÄčClick here for a list of all construction project updates.

Forms, Manuals & Details

Below are individual master plans and photos for parks currently under construction and/or renovation:

Buckhorn Park
Complete renovation of Buckhorn Park to include a new pavilion, new playground, new irrigation system, tree planting and significant grading and drainage improvements. 
Buckhorn Park Master Plan

Buckhorn Park Construction Pictures
Buck1

Buckhorn2

Carpenter Park
Renovation of the athletic fields south of the drainage channel with the addition of a skate park.  CMAR selected, design documents in review prior to GMP bidding.
Jack Carter Park
The renovation project converts the old pool to a pond with a fountain. A new pond overlook plaza and trellis will be adjacent to the pond. The existing restroom is being renovated. A new inclusive playground is going in, and a new segment of trail will connect all of the elements.
Jack Carter Park Construction Pictures
JCP Web22  JCP23WEB    

Bob Woodruff Park North 
This construction project will consist of a new retaining wall located on the east side of the playground, existing wall repair/replacement around the pavilion/bus drop off lane, decomposed granite surfacing to improve the space around the pavilion that is lacking vegetation, and turf grass replacement throughout the construction area. 
bobwWEB

Oak Point Park & Nature Preserve Improvements
Click here for project information.
Site Plan

Stimpson and Drake Park

Formerly known as the Douglass Neighborhood Park Site, the park was formally named Stimpson and Drake Park by City Council on March 14th, 2016. The name of the park was recommended by Team Douglass, Douglass Community Seniors, Douglass Community Neighborhood Association and Affect, Inc. The park is named after Mose Stimpson and Andy Drake who were the first African American free men to be share croppers in Plano. The park will wrap up construction in early summer.
 IMG_1999 

Windhaven Meadows Park
Improvements at the park include parking, restrooms, a large pavilion, a dog park, a playground, trails and associated improvements. Council direction is to move pavilion and adjust parking lot. House is to be fenced and protected during construction until bond election in May 2017.